Document Type : Review Article

Authors

Department of Electrical and Computer Engineering, University of Tabriz, Tabriz, Iran

Abstract

In this paper, a novel protection coordination optimization algorithm is proposed. The purpose is to maximize the disperse generation penetration and, at the same time, to minimize the operating time of fuses. A novel optimization technique, the Imperialistic Competition Algorithm (ICA), is applied to solve the problem. The results of simulations confirm that the proposed method leads to lower operating times of protective devices and higher possible DG penetration, compared with the traditional coordination techniques.

Keywords

[1] W. El-Khattam and M. M. A. Salama, “Distributed generation technologies, definitions and benefits,” Elect. Power Syst. Res., vol. 71, no.2, pp. 119–128, Oct. 2004.
[2] T. E. McDermott and R. C. Dugan, “Distributed generation impact on reliability and power quality indices,” in Proc. IEEE Rural Electric Power Conf., May 2002, pp. D3–D3_7.
[3] P. P. Barker and R. W. Mello, “Determining the impact of distributed generation on power systems: Part 1 – Radial distribution systems,” in Proc. IEEE Power Eng. Soc. Summer Meeting Conf., 2000, pp.1645–1656.
[4] R. C. Dugan and T. E. McDermott, “Distributed generation,” IEEE Ind. Appl. Mag., vol. 8, no. 2, pp. 19–25, Mar. 2002.
[5] S. Chaitusaney and A. Yokoyama, “Prevention of reliability degradation from recloser-fuse miscoordination due to distributed generation,” IEEE Trans. Power Del. vol. 23, no. 4, pp. 2545–2554, Oct. 2008.
[6] A. F. Naiem, Y. Hegazy , A . Y. Abdelaziz, and M. A. Elsharkawy, “A classification technique for recloser-fuse coordination in distribution systems with distributed generation,” IEEE Trans. Power Del. 2011.
[7] P. Mahat , Zhe Chen , B. Bak-Jensen and C. L. Bak , “A simple adaptive overcurrent protection of distribution systems with distributed generation,” IEEE Trans. Smart Grid. vol. 2, no. 3, pp. 428–437, Sep. 2011.
[8] A. A. Girgis and S. M. Brahma, “Effect of distributed generation on protective device coordination in distribution system,” i n Proc. IEEE Large Eng. Syst. Conf. , 2001, pp. 115–119.
[9] S. M. Brahma and A. A. Girgis, “Microprocessor-based reclosing to coordinate fuse and recloser in a system with high penetration of distributed generation,” in Proc. IEEE Power Eng. Soc. Winter Meeting , 2002, pp. 453–458.
[10] J. K. Tailor and A. H. Osman, “Restoration of fuse-recloser coordination in distribution system with high DG penetration,” i n Proc. IEEE Power Energy Soc. Gen. Meeting , 2008, pp. 1–8.
[11] S. Chaitusaney and A. Yokoyama, “Reliability analysis of distribution system with distributed generation considering loss of protection coordination,” i n Proc. Int. Conf. Probabilistic Meth. Appl. Power Syst. , 2006, pp. 1–8.
[12] S. M. Brahma and A. A. Girgis, “Development of adaptive protection scheme for distribution systems with high penetration of distributed generation,” IEEE Trans. Power Del., vol. 19, no. 1, pp. 56–63, Jan. 2004.
[13] S. Chaitusaney and A. Yokoyama, “An appropriate distributed generation sizing considering recloser-fuse coordination,” in Proc. IEEE Power Eng. Soc. Transmission and Distribution Conf. Exhibit., pp. 1–6,2005.
[14] J. Sadeh, M. Bashir and E. Kamyab, “Effect of Distributed Generation Capacity on the Coordination
of Protection System of Distribution Network,” Transmission and Distribution Conf. and Exp., IEEE press, 2010.
[15] W. J. Park, B. Ch. Sung, K. B. Song and J. W. Park, “Parameter Optimization of SFCL With Wind-Turbine Generation System Based on Its Protective Coordination,” IEEE Trans. Applied Superconductivity, vol. 21, no. 3, pp. 2153–2156, Jun. 2011.
[16] W. El-Khattam, and T. S. Sidhu, “Restoration of Directional Overcurrent Relay Coordination in Distributed Generation Systems Utilizing Fault Current Limiter” IEEE Trans. Power Del., vol. 23, no. 2, pp. 576–585, Apr. 2008.
[17] H. J. Lee, G. Son, and J. W. Park, “Study on Wind-Turbine Generator System Sizing Considering Voltage Regulation and Overcurrent Relay Coordination,” IEEE Trans. Power sys., vol. 26, no. 3, pp. 1283–1293, Aug. 2011.
[18] E. A. Gargari and C. Lucas, “Imperialist competitive algorithm: An algorithm for optimization inspired by imperialistic competition,” in Proc. IEEE Congr. Evolutionary Computation, 2007.
[19] A. Soroudi, and M. Ehsan, “Imperialist competition algorithm for distributed generation connections, ” IET Gener. Transm. Distrib., vol. 6, Iss. 1, pp. 21–29, 2012.
[20] R. Jahani, A. Hosseinzadeh, A. Hosseinzadeh, and M. Mohammad Abadi, “ICA-based Allocation of DGs in a Distribution System, ” American Journal of Scientific Research, Iss. 33, pp. 64-75,2011.
[21] Mahari, Arash, and Heresh Seyedi. "Optimal PMU placement for power system observability using BICA, considering measurement redundancy." Electric Power Systems Research 103 (2013): 78-85..
[22] A.Rabii, S. Mobaeen, H. Jafary, and H. Shahbazi, “Novel Approach for Reactive Source Sizing and Placement in Distribution Networks, ” Journal of Basic and Applied Scientific Research, pp. 114-117, 2011.
[23] Mahari, Arash, and Ebrahim Babaei. "Optimal DG placement and sizing in distribution systems using imperialistic competition algorithm." Power Electronics (IICPE), 2012 IEEE 5th India International Conference on. IEEE, 2012.
[24] M. M. Hadji, and B. Vahidi “A Solution to the Unit Commitment Problem Using Imperialistic Competition Algorithm” IEEE Trans. Power Systems, vol. 27, no. 1, pp. 117-124, 2012.
[25] R. N. Allan, R. Billinton, I. Sjarief, L. Goel, and K. S. So, “A reliability test system for educational purposes – Basic distribution system data and results,” IEEE Trans. Power Syst., vol. 6, no. 2, pp. 813–820, May 1991.